Dongturbo offers EPC service of biomass and MSW power plant, hereafter mainly focus on the MSW power plant. On the MSW-To-Energy power plant, Dongturbo dedicate to provide clients with "one-stop" solution, involving wastes disposal, environmental pollution, social pressure, finance, etc.
Our company While cultivating the use of traditional fossil fuel energy (including coal, oil, natural gas, etc.) and our company is also devoted in the use of renewable energy (including biomass waste,, household waste, industrial waste, hazardous waste, sludge, biogas, etc.) and ultra‐clean gas emissions (including dust removal, desulfurization, denitration, mercury removal, whitening, VOCs, etc.) and other environmental protection fields with fruitful achievements.
Our company is equipped with a digital platform for the entire engineering process of digital design, digital delivery, and digital operation and maintenance.Our company adopts Bentley series softwares for 3D digital design, which can realize various design functions, including 3D parametric modeling, surface and solid modeling, pipeline modeling, facility planning, GIS mapping, 3D HVAC modeling, etc.
We provide comprehensive services of technical consultation, technology development, professional design, complete equipment manufacturing and EPC contracting and so on. We always stick to the principle of quality first and reputation supreme and the service concept of “from customer’s need, to customer’s satisfaction” to convey the professional service and create high‐quality projects.d maintenance.
No. | Projects | Unit | Index |
1 | Daily treatment capacity | ton/d | 1500 |
2 | Annual treatment capacity | tons/year | 500,000 |
3 | Low heat value | kJ/kg | 4200~9000 |
4 | Operation hours (per year) | h | >8000 |
5 | Grid power generation | 108`kWh/year | 1.7~2.0 |
6 | Power consumption of plant | % | 18~20 |
7 | Steam turbine output | MW | 25 |
8 | Thermal efficiency (whole process) |
% | 22~23 |
9 | Service life | year | 25~30 |
10 | Water consumption | tons/year | 1,240,000 |
11 | Plant area | square meters | 90,000~100,000 |
12 | Employee | persons | 90~100 |
13 | Construction period | month | 30~36 |