Dongturbo and its management has been in the coal fire power plant industry for more than 20 years with rich experience. We have established close partner relationship with design institutes, manufacturers, erection companies, traders and end customers both in China and all over the world. Our professional engineering, project management contributed to the success of the contracted projects, meanwhile, we also shared a lot from those success, we became technical expertise for systematic solution for power industry.
Our company While cultivating the use of traditional fossil fuel energy (including coal,oil,natural gas,etc.) and our company is also devoted in the use of renewable energy (including biomass waste,,household waste,industrial waste,hazardous waste,sludge,biogas,etc.) and ultra‐clean gas emissions (including dust removal,desulfurization,denitration,mercury removal,whitening,VOCs,etc.) and other environmental protection fields with fruitful achievements.
Our company is equipped with a digital platform for the entire engineering process of digital design,digital delivery,and digital operation and maintenance.Our company adopts Bentley series softwares for 3D digital design,which can realize various design functions,including 3D parametric modeling,surface and solid modeling,pipeline modeling,facility planning,GIS mapping,3D HVAC modeling,etc.
We provide comprehensive services of technical consultation,technology development,professional design,complete equipment manufacturing and EPC contracting and so on. We always stick to the principle of quality first and reputation supreme and the service concept of “from customer’s need,to customer’s satisfaction” to convey the professional service and create high‐quality projects.d maintenance.
Our typical reference projects are as follows
GUANGDONG DONGGUAN SHENGMING POWER PLANT CO-GENERATION PROJECT
SCOPE: EPC FOR1500KW+800KW POWER PLANT
GUANGDONG SHAOGUAN SHILITING POWER PLANT WASTE HEAT PROJECT
SCOPE: EPC FOR 2x2300KW POWER PLANT
GUANGDONG DONGGUAN DONGHUA POWER PLANT WASTE HEAT PROJECT
SCOPE: EPCFOR 2x2300KW POWER PLANT
GUANGDONG PANYU LIANHUA MOUTAIN POWER PLANT WASTE HEAT PROJECT
SCOPE: EPC FOR 2300KW+1500KW POWER PLANT
GUANGDONG PANYU LIANHUA MOUTAIN POWER PLANT WASTE HEAT PROJECT,
SCOPE: EPC FOR 2300KW+1500KW POWER PLANT
FUJIAN FUZHOU RONGCHANG POWER LIMITED COMPAMY WASTE HEAT PROJECT
SCOPE:EPC FOR 1x2300KW POWER PLANT
SICHUAN YIBIN PAPER 3000KW CO-GENERATION PROJECT,S
SCOPE: Erection and Commissioning FOR 3000KW STG
GUANGDONG SHUNDE HUAFA POWER PLANT LIMITED COMPANY WASTE HEATPROJECT
SCOPE: EPC FOR 1x3000KWSTG
SICHUAN JIANGYOU POWER PLANT 50MW TURBINE CONTROL SYSTEM REFORM
SCOPE: EPC FOR 4x50MW STG CONTROL SYSTEM REFORM
GUANGDONG DONGGUAN ZHANGMUTOU GANGZHONG POWER LIMITED
SCOPE: EPC FOR 1>3000KWSTG
SHENZHEN SHANGDONG POWER PLANT WASTE HEAT PROJECT
SCOPE: EPC FOR 2x1700KW STG
SHENZHEN KUIYONG POWER PLANT WASTE HEAT POWER PROJECT
SCOPE: EPC FOR 3x800KWSTG
SICHUAN LONGMANG GROUP 750MW CO-GENERATION PROJECT
SCOPE: EPC FOR 1X750KW STG
GUANGDONG JIANGMEN GUOYANG THERMOELECTRICITY LIMITED COMPANY 50MW TURBINE HEAT SUPPLY REFORM
SCOPE: REFORM FOR 2X50MW TURBINE
15, SICHUAN YIBIN PAPER 12MWTURBINE FLOW REFORM
SCOPE: REFORM FOR IX12MW TURBINE
XINJIANG YILI NANGANG THERMOELECTRICITY SOMW TURBINE HEAT
SUPPLY AND STEAM EXTRACTION REFORM
SCOPE: REFORM FOR 2X50MWSTEAMTURBINE
JIANGSU HUAIAN IRON AND STEEL GROUP 25MW TURBINE HEAT SUPPLY
AND STEAM EXTRACTION REFORM
SCOPE: REFORM FOR 1*25MW STEAM TURBINE
SICHUAN XINJIN LIANFA SODIUM SULFATE FACTORY 1500KW TURBINE
FLOW REFORM
SCOPE: REFORM FOR 1X1500KW STEAMTURBINE
SICHUAN MIANYANG CHUANYIN CHEMICAL INDUSTRY GROUP 1500KW
TURBINE HEAT SUPPLY AND STEAM EXTRACTION REFORM
SCOPE: REFORM FOR 1x1500KW STG
INDONESIA LAMPUNG 2XIISMW COAL FIRED POWER PLANT
SCOPE: 1. ENGIN