Dongturbo offers EPC service of biomass and MSW power plant, hereafter mainly focus on the MSW power plant. On the MSW-To-Energy power plant, Dongturbo dedicate to provide clients with "one-stop" solution, involving wastes disposal, environmental pollution, social pressure, finance, etc.
EPC/Investment & Operation
Solution of Waste to Energy
Waste receiving and storage system
MSW pre-treatment system
MSW incineration system
Mechanical grate boiler
CFB incinerator of MSW
Heat recovery system
Flue gas treatment system
Bottom ash handling system
Fly ash handling system
Leachate Treatment System
Leachate Treatment System
Odor control system
General plant layout
Service upgrading
Sample economy index
No. | Projects | Unit | Index |
1 | Daily treatment capacity | ton/d | 1500 |
2 | Annual treatment capacity | tons/year | 500,000 |
3 | Low heat value | kJ/kg | 4200~9000 |
4 | Operation hours (per year) | h | >8000 |
5 | Grid power generation | 108`kWh/year | 1.7~2.0 |
6 | Power consumption of plant | % | 18~20 |
7 | Steam turbine output | MW | 25 |
8 | Thermal efficiency (whole process) | % | 22~23 |
9 | Service life | year | 25~30 |
10 | Water consumption | tons/year | 1,240,000 |
11 | Plant area | square meters | 90,000~100,000 |
12 | Employee | persons | 90~100 |
13 | Construction period | month | 30~36 |
The max. treatment capacity per boiler liner is 750 TPD, which runs stably, reliably and efficiently.
Strong adaptability to MSW with high water contents, low heat value, and complex composition.
High burning efficiency and lower clinker ignition loss.
Adopt high-efficiency generator sets, which bring economic plant thermal efficiency.
Adopt cleanly environmental technology, which make the pollutant emission concentration are lower than EU2000
Plan rationally, design subtly, and build one-stop Garden layout MSW project.